North Pole, AK

This project included dredging two lagoons and dewatering the biosolids on-site with one of our mobile belt filter presses. This project was expected to take 1-2 months to complete. We completed pressing the needed 155 dry tons in less than a month. Once the project ended we transported the equipment to Anchorage where it was loaded onto large ocean steam ships. These ships transported our equipment back down to the lower 48 states were we took the equipment from the docks to the next project!